US Navy seeks life extension to meet 355-ship fleet
Although one step in a lengthy process, the US Navy set out its efforts on 12 February to recapitalise its fleet and significantly increase the number of hulls in its inventory.
Releasing its ‘Long-Range Plan’ for naval vessel construction from FY19, the document calls for an increase in key shipbuilding programmes.
According to the report the average ship construction budget up to FY23 is $19.7 billion per year, which would have to increase to $25 billion per year beyond then ‘to sustain the baselines stable acquisition profiles’.
Key themes identified in the National Defense Strategy formed the ‘overarching guidance’ for
Already have an account? Log in
Want to keep reading this article?
More from Naval Warfare
-
Spain’s F100 upgrade mirrors Aegis modernisation paths in allied navies
The Spanish Navy’s Alvaro de Bazan-class of air defence frigates will receive the latest Aegis Weapon System technology among other modernisations to extend the service life to 2045.
-
UK’s Fleet Solid Support ship programme deemed on track despite steel supply concerns
Shipbuilders are saying the programme is going ahead on time as the government estimates 7.7 million tonnes of steel are needed for 2026 infrastructure projects.
-
US Coast Guard Cutter Polar Star’s 50-year service highlights capability gaps in Antarctica
Delays in the construction of the Polar Security Cutter – the future substitute for the Polar Star – are likely to prolong the ageing icebreaker’s service time even more, putting the USCG in a risky position.
-
As Indonesia doubles up its order, who else is looking at the Arrowhead 140 frigate design?
The adaptable design of Babcock’s Arrowhead 140 frigate, already selected by the UK Royal Navy and Poland, has led to more orders from Indonesia while other countries continue to weigh it up.