Boeing furthers Ground-Launched SDB
Boeing is moving forward with development of the ground-launched variant of its Small Diameter Bomb (SDB), which it believes fills a gap for long-range precision fires.
The company is modifying the Ground-Launched SDB so it can be operated from systems such as the M270 Multiple Launch Rocket System (MLRS), using a rocket motor to gain enough altitude and speed to deploy its wings and glide to the designated target.
Jeff Ayers, Boeing director of cruise missile systems, said the variant was attracting early interest from potential customers and the company was looking to carry out a demonstration next year.
‘One
Already have an account? Log in
Want to keep reading this article?
More from Land Warfare
-
US Army moves towards calls for bids for medium UGV as competitors warm up
The US Army’s Medium Modular Equipment Transport Trailer (M-METT) programme is planned to provide a platform between Increment II of Small Multipurpose Equipment Transport and the Palletized Load System.
-
Why bridging the gap between military and COTS systems is key to seamless defence comms (Studio)
Technology that enables armed forces to leverage existing network infrastructure can be a game-changer in many combat scenarios.
-
Europe’s future tank hits targets as MARTE programme gains momentum
An effort to develop a new European main battle tank has passed several milestones on the road to a Preliminary Design Review which is expected within two years.
-
UK MoD clears British Army’s Ajax saying “no safety concerns when operated properly”
The British Army’s Ajax armoured personnel carrier has a chequered history but hopes were high when Initial Operating Capability was declared last year. More problems saw operations suspended but the MoD reports it has identified the problems and short- and medium-term solutions.
-
Land Rover retirement schedule puts pressure on British Army vehicle plans
The British Army’s plans to replace thousands of vehicles have been troubled with resets, delays and change. It is possible, however, that genuine progress is being achieved on two of the three segments in the programme.