Proximity round demonstrates enhanced C-UAS capabilities
Northrop Grumman and industry partners are conducting private firing demonstrations of a new XM1211 30x113mm proximity fuzed round for use with the M230 LF cannon.
This week’s demonstrations, attended by Shephard, featured the cannon integrated onto two Northrop Grumman Scorpion gun truck platforms and engaging a number of small UAVs.
Maj Gen (ret.) Kent Savre, senior director at Northrop Grumman, said the XM1211 demonstrations highlight the growing air threat posed by UAVs. He added that the tests also show that units can use currently fielded weapon systems to protect themselves from UAV threats while continuing their assigned mission.
‘The
Already have an account? Log in
Want to keep reading this article?
More from Land Warfare
-
US Army moves towards calls for bids for medium UGV as competitors warm up
The US Army’s Medium Modular Equipment Transport Trailer (M-METT) programme is planned to provide a platform between Increment II of Small Multipurpose Equipment Transport and the Palletized Load System.
-
Why bridging the gap between military and COTS systems is key to seamless defence comms (Studio)
Technology that enables armed forces to leverage existing network infrastructure can be a game-changer in many combat scenarios.
-
Europe’s future tank hits targets as MARTE programme gains momentum
An effort to develop a new European main battle tank has passed several milestones on the road to a Preliminary Design Review which is expected within two years.
-
UK MoD clears British Army’s Ajax saying “no safety concerns when operated properly”
The British Army’s Ajax armoured personnel carrier has a chequered history but hopes were high when Initial Operating Capability was declared last year. More problems saw operations suspended but the MoD reports it has identified the problems and short- and medium-term solutions.
-
Land Rover retirement schedule puts pressure on British Army vehicle plans
The British Army’s plans to replace thousands of vehicles have been troubled with resets, delays and change. It is possible, however, that genuine progress is being achieved on two of the three segments in the programme.