MBDA conducts successful demonstrations of new bunker buster warhead
The second test firing of the Hard and Deeply Buried Target (HARDBUT) Next Generation Multiple Warhead System (NGMWS) was carried out successfully at the Biscarrosse test range of DGA Essais de Missiles on 14th September 2010. The HARDBUT Technology Demonstration Programme (TDP) is a successful warhead research programme jointly funded by the UK MoD and French Direction Générale de l'Armement (DGA) with MBDA UK as the Prime Contractor. The NGMWS is designed to defeat a wide range of targets such as command and control facilities, infrastructure and underground facilities including caves, reflecting current and potential future operations.
The firing was carried out using a representative missile airframe on the long rocket sled test track at Biscarrosse. The live Precursor Charge (PC) was detonated just in front of the massive concrete target and the inert Follow-Through Bomb (FTB) penetrated through and exited the rear face of the target, demonstrating a penetration capability significantly in excess of any warhead currently produced by MBDA. The trial was also designed to assess the robustness of the compact Ruggedized Electronic In-line Fuze (REIF) which will incorporate embedded smart fuzing algorithms. The target and trial set-up were designed to be operationally representative.
This trial builds upon the successful 1st trial conducted at the Biscarrosse test range on the 18th May 2010, where the novel concepts underpinning the NGMWS design were successfully demonstrated.
The TDP is being jointly managed by the UK MoD (DE&S) and the French MoD (DGA), supported by Defence Science and Technology Laboratory (DSTL) and the Commissariat à l'Energie Atomique et aux énergies alternatives, Centre de Gramat (CEA Gramat), and successfully delivered by MBDA teams in the UK and in France, Thales Missile Electronics (TME), QinetiQ, BAE Systems Global Combat Systems Munitions (GCSM) and Fluid Gravity Engineering (FGE). The TDP has previously been independently audited by Cranfield University and assessed as delivering research of a world class standing.
The MBDA team has now twice successfully demonstrated the performance of this new warhead design by perforation of massive concrete targets, together with successful recovery of the inert FTB and fuze from the capture butt. This represents the successful conclusion of the second stage of this TDP, proving the warhead concept and enhancing MBDA's world leading capability in warhead design. A third and final proving trial will conclude the TDP research objectives.
Source: MBDA
More from Land Warfare
-
Bulgaria to receive first Strykers in February as part of force equipment refresh
The delivery of the Stryker infantry fighting vehicles will form one piece of the country’s effort to re-equip its forces, which includes F-16 fighter jets and new air defence systems.
-
Rheinmetall KF41 Lynx fighting vehicles set for first taste of combat in Ukraine
A June 2024 agreement with Ukraine for Rheinmetall to provide 10 KF41s along with the establishment of a manufacturing facility in the country has moved a step closer, with the factory now built and a contract signed.
-
Germany increases Arrow missile defence deal to $6.1 billion as American interest grows
Germany’s move to buy Israel Aerospace Industries’ Arrow missile defence system became public in mid-2023 with approval from the US government shortly after. The first operational system is expected to be in service before 2030.
-
Sweden’s recent air defence spend tips to $6 billion with 2026 procurement planned
Procurement of various short-range systems will begin in the first quarter of 2026, with additional procurements to be made later in the year.