IDEF 2013: Altay MBT completes critical design review
Turkey’s new-generation MBT is almost at the end of its detailed design phase, with manufacturer Otokar awaiting approval of the final design.
The company has now completed the critical design review (CDR) of the Altay MBT and hopes to begin the prototype development and qualification phase shortly.
Speaking at the IDEF exhibition in Istanbul, where the Altay was the centrepiece of Otokar’s stand, a spokesman told Shephard that the company is waiting for the Defence Industries Undersecretariat (SSM) to approve the critical design before formally moving into the next phase of development.
Alongside its development of the vehicle, the company
Already have an account? Log in
Want to keep reading this article?
More from Land Warfare
-
US Army moves towards calls for bids for medium UGV as competitors warm up
The US Army’s Medium Modular Equipment Transport Trailer (M-METT) programme is planned to provide a platform between Increment II of Small Multipurpose Equipment Transport and the Palletized Load System.
-
Why bridging the gap between military and COTS systems is key to seamless defence comms (Studio)
Technology that enables armed forces to leverage existing network infrastructure can be a game-changer in many combat scenarios.
-
Rheinmetall Nordic’s Ragnarok mortar upgrade shows strong integration potential
The Ragnarok Mortar Mission Module has demonstrated its ability to quickly switch platforms, presenting scope for it to be employed for multiple requirements.