US Coast Guard selects Sagem BlueNaute system
Sagem’s BlueNaute heading reference system has been selected by the US Coast Guard to upgrade 12 of its Juniper WLB class vessels, the company announced on 29 April.
Sagem's BlueNaute reference system is based on hemispherical resonator gyros, a proprietary technology designed to give the BlueNaute high reliability and precise measurements.
According to the company, the BlueNaute's inertial core offers a competitive advantage in terms of total cost of ownership and performance over the previous generation of inertial technologies, especially fibre-optic and mechanical models.
The BlueNaute's mean time between failures exceeds 100,000 hours and it is suitable for use in coast guard or police missions, offshore operations, scientific missions and at-sea searches.
More from Naval Warfare
-
Australia’s A$12 billion Perth shipyard upgrade offers positive sign for AUKUS
While the Australian government insists the investment is predominantly aimed at strengthening the country’s defence capabilities, the upgrade also bodes well for the AUKUS pact which Australia’s defence minister said “is going well”.
-
DSEI 2025: Red Cat expands into USV production with focus on combat-proven technology
At DSEI 2025, Red Cat outlines its expansion from UAVs into uncrewed surface vessels (USVs), positioning itself as a multi-domain defence provider spanning land, sea, and air.
-
Anduril Australia wins A$1.7 billion Ghost Shark XL-AUV contract
The vessels are expected to deliver a major boost to Australia’s undersea warfare capabilities, with production set to start immediately.
-
Royal Canadian Navy will start operating class 2 UAVs in 2028
Acquired under Canada’s Department of National Defence ISTAR UAS project, the drones will be deployed from the Halifax-class frigates.
-
US Navy prepares next step of the F-35 Block 4 upgrade while GAO predicts acquisition delays
The US Navy published a pre-solicitation notice of intent for the third phase of the F-35 Reprogramming Verification & Validation System. Meanwhile, with a five-year delay in its schedule, GAO foresees more postponements in the completion of the Block 4 effort.