GRSE to supply vessels to Indian Navy
The Indian MoD has awarded a $331.34 million contract to Garden Reach Shipbuilders & Engineers (GRSE) to design, construct and supply four survey vessels for the Indian Navy.
The first ship will be delivered within 36 months and the remaining three at six-month intervals.
The vessels will be 110m in length with a displacement of 3,300t. They will be equipped with advanced hydrographic equipment and sensors, and a hangar to accommodate one Advanced Light Helicopter.
Capable of full-scale coastal and deep-water hydrographic survey of ports and harbours, the vessels will also operate in approaches and navigational channels/routes, and will undertake surveys of maritime limits up to the exclusive economic zone/extended continental shelf.
The fleet will be deployed to collect oceanographic and geophysical data for defence applications as well as performing limited SAR, limited ocean research and operating as hospital ship/casualty holding ships.
The design will conform to the latest marine pollution standards of the International Maritime Organisation.
Related Equipment in Defence Insight
More from Naval Warfare
-
Australia is ramping up its uncrewed surface fleet as Sea Archer lines up for key requirement
As advances in uncrewed technology increasingly shape Australia’s maritime future, Shephard spoke with the country’s head of navy capability and a Leidos Australia executive about the operational advantages behind the shift.
-
What does Saab’s operations shake-up mean for its new ‘Naval’ chapter?
Saab’s merger of its Kockums and Naval Combat Systems divisions into a single business area called Naval, effective 1 April 2026, aims to enhance efficiency, innovation and competitive positioning in the naval sector.
-
Iran and the future of amphibious operations: crewed and uncrewed solutions
Amphibious operations are a very unique type of military operation, and global defence industries are developing new solutions to enhance capabilities and efficiency.
-
US Navy to acquire and test uncrewed surface vessel prototypes by the end of FY2026
The new autonomous surface vessels are planned to be operationally fielded in FY2027, following the completion of on-water trials.
-
Hanwha Ocean and TKMS are firming up their Canadian next-gen submarine proposals
CPSP competitors are proposing platforms fitted with advanced, next-generation capabilities to be built and sustained in cooperation with the Canadian industry.