Replenishing Vietnam Coast Guard
The Vietnam Coast Guard (VCG) has received its largest vessel yet, in the form of a 90m multirole replenishment vessel.
After being handed over on 14 July, CSB 7011 will operate in Zone 3 in the south-central waters of Vietnam near the Spratly Islands.
The 2,900t ship CSB 7011 constructed by the Hong Ha Shipyard in Haiphong is designed to carry up to 500m³ of oil/fuel, 2,000m³ of fresh water, 300t of dry cargo such as food or technical supplies and 30t of refrigerated cargo.
CSB 7011 contains several first aid clinics for medical attention and multiple repair shops for
Our news & analysis is now part of Defence Insight®
A Basic-level or higher Defence Insight subscription is now required to view this content.
More from Naval Warfare
-
Australia is ramping up its uncrewed surface fleet as Sea Archer lines up for key requirement
As advances in uncrewed technology increasingly shape Australia’s maritime future, Shephard spoke with the country’s head of navy capability and a Leidos Australia executive about the operational advantages behind the shift.
-
What does Saab’s operations shake-up mean for its new ‘Naval’ chapter?
Saab’s merger of its Kockums and Naval Combat Systems divisions into a single business area called Naval, effective 1 April 2026, aims to enhance efficiency, innovation and competitive positioning in the naval sector.
-
Iran and the future of amphibious operations: crewed and uncrewed solutions
Amphibious operations are a very unique type of military operation, and global defence industries are developing new solutions to enhance capabilities and efficiency.
-
US Navy to acquire and test uncrewed surface vessel prototypes by the end of FY2026
The new autonomous surface vessels are planned to be operationally fielded in FY2027, following the completion of on-water trials.