Raytheon to continue EASR development for ONR
Raytheon will further development of an Enterprise Air Surveillance Radar (EASR) for ship self-defence and situational awareness under a $6 million study and demonstration contract received from the Office of Naval Research (ONR).
The contract will see the company continue work to leverage proven Radar Modular Assembly (RMA) architecture matured on Air and Missile Defense Radar (AMDR) for the development of EASR. The radar is being developed to meet the self-defence, situational awareness, air traffic control and weather monitoring requirements of different ship classes.
According to Raytheon, the Radar Modular Assembly (RMA) affords EASR the scalability to be used on a variety of ship sizes across a diverse set of mission requirements. This should reduce total ownership cost across all the EASR equipped platforms. The RMA has been designed and tested to prove that it operates successfully in the stressing EASR naval marine environments.
Paul Ferraro, vice president of Advanced Technology Programs, Raytheon's Integrated Defense Systems, said: ‘It is clear that the navy is committed to leveraging the latest in technology and innovation to stay ahead of evolving threats. The next generation EASR radar programme is the latest example of Raytheon's partnership with ONR to drive advancement and provide affordable best in class solutions.’
Raytheon will apply its experience as the provider of Dual Band Radar (DBR) and SPS-49 to EASR development. Investment in the ONR Digital Array Radar (DAR) and AMDR programmes will also be leveraged.
More from Naval Warfare
-
Khabarovsk submarine launch reflects Russia’s nuclear modernisation progress
The nuclear-powered vessel, which could carry the Poseidon autonomous torpedo – dubbed the “doomsday missile” – marks another step forward in Russia’s maritime defence push.
-
Anduril Australia shows first Ghost Shark for RAN at factory opening
The new underwater vehicle has been described as an “important deterrent” thanks to its ability to operate undetected for extended periods of time.
-
First Canadian Coast Guard Polar Icebreaker is “on track” for keel laying in late 2026
Canadian Coast Guard Ship Arpatuuq construction is in the block manufacturing phase. Once built, it will be the largest vessel in the Coast Guard’s inventory.
-
US Navy extends the deadline for submitting proposals for the Next Generation Logistics Ship
NAVSEA plans to select up to three suppliers for the concept design phase of the programme in Q2 FY2026.
-
Advances in USV technology help develop tomorrow’s hybrid fleet
As services like the Royal Navy and US Navy aim to develop hybrid fleets to reduce reliance on and dangers to crewed vessels, L3Harris, Metal Shark and Red Cat step forward.