First Indian P-8I MPA arrives in-country
The first P-8I Maritime Patrol Aircraft (MPA) delivered by Boeing for the Indian Navy has arrived in India. The aircraft is the first of eight P-8I MPAs to be delivered by Boeing under a contract signed in 2009.
The Indian Navy will deploy the P-8I MPA fleet in a long-range maritime reconnaissance and anti-submarine warfare role as a replacement for its ageing Tupolev Tu-142M maritime surveillance turboprop fleet. The aircraft is a customised export version of the P-8A Poseidon – based on the Boeing next generation 737 - in development for the US Navy.
The P-8I incorporates design features unique to the Indian requirement, and Indian-built subsystems that are tailored to the country’s maritime patrol needs. The aircraft will be armed with the AGM-84L Harpoon Block II missile and the MK 54 lightweight torpedo.
Chris Chadwick, president, Boeing Military Aircraft, said: ‘Boeing is proud to deliver this advanced aircraft to meet the Indian Navy’s unique maritime patrol requirements. The P-8I team, which includes our customer and Indian suppliers, has done a fantastic job working together, and we’re on track to deliver the next two P-8I aircraft later this year.’
More from Naval Warfare
-
US Navy’s MUSV programme could lay the USV procurement blueprint for NATO allies
The programme’s structure as a marketplace will allow multiple companies to compete for ongoing procurements; an approach which could be replicated across the Atlantic.
-
Funding for the future US Navy Trump-class battleship sparks controversy in Congress
Lawmakers question the US Navy’s proposed $2 billion investment in the Trump-class battleship as concerns over cost, technology maturity and operational relevance fuel growing bipartisan scrutiny on Capitol Hill.
-
Germany sinks F126 frigate programme in favour of cheaper MEKO A-200
On 24 June 2026, the German Ministry of Defence announced it was cancelling the F126 frigate programme in favour of procuring eight MEKO A-200 DEU frigates.
-
UK’s Type 31 frigate balances cost pressure with long-term export ambition
The UK shipbuilder’s full-year results to the end of March revealed the impact of the £140 million charge linked to design changes and rework on the Royal Navy’s Type 31 frigate programme.