BAE Systems receives howitzer contract modification
BAE Systems Land & Armaments has received a contract modification from the US Army for its work on the Self Propelled Howitzer, Carrier-Ammunition Tracked vehicle, the US Department of Defense announced on 4 October.
The $48 million modification covers long lead material associated with the build of the Self Propelled Howitzer, Carrier-Ammunition Tracked vehicle.
Work will be complete by January 2023.
More from Land Warfare
-
Japan orders THeMIS UGVs
Milrem’s Tracked Hybrid Modular Infantry System (THeMIS) is a modular, multimission, hybrid UGV. The current fifth-generation model incorporates knowledge gained during tests in the US, Europe and the Middle East, as well as during field-deployment in Mali in the French-led Operation Barkhane.
-
GDELS rolls out Piranha HMC
General Dynamics European Land Systems (GDELS) MOWAG has introduced the Piranha Heavy Mission Carrier (10x10), an enhanced version of its Piranha armoured vehicle series, featuring increased payload capacity and specialised configurations for diverse battlefield roles.
-
US deploys Mid-Range Capability missile defence system to the Philippines
Mid-Range Capability (MRC) missile defence system has leveraged Lockheed Martin’s expertise with two in-service USN systems: the MK 41 Vertical Launching System (VLS) and the Aegis Weapon System.
-
USMC narrows down field for light loitering munition requirement
The US Marine Corps selected a team of UVision and Mistral to meet a requirement for Organic Precision Fires Mounted (OPF-M) loitering munition in 2021. It has now awarded contracts for the soldier carried light (OPF-L) version after the success of similar systems in Ukraine highlighted the potential for such weapons.