LCS 21 launched and christened
The US Navy’s Littoral Combat Ship (LCS) 21, has been launched at the Fincantieri Marinette Marine shipyard and christened as the future USS Minneapolis-Saint Paul.
The LCS is designed to complete close-to-shore missions, with a reconfigurable hull that can integrate capabilities including over-the-horizon missiles, advanced electronic warfare systems and decoys, and in the future, vertical launching systems or laser weapon systems.
The vessel is capable of speeds in excess of 40 knots, and is armed with Rolling Airframe Missiles and a Mark 110 gun capable of firing 220 rounds per minute.
Lockheed Martin is in full-rate production and has delivered eight ships to the US Navy. This year, Lockheed Martin and Fincantieri Marinette Marine will begin construction on two ships, deliver two ships, complete sea trials for two ships and see three ships commissioned: LCS 13, 15 and 17.
Related Equipment in Defence Insight
More from Naval Warfare
-
US Coast Guard enhances Arctic protection with a new Fast Response Cutter
After commissioning, FRC Frederick Mann will operate in Alaska and perform multiple missions.
-
US Coast Guard announces measures to further implement Force Design 2028 strategy
The US Coast Guard (USCG) created new units, including five Programme Executive Offices (PEOs), to facilitate and speed up the procurement of new capabilities.
-
Future of the US Navy’s Arleigh Burke programme remains unclear
The US Navy does not have a precise date for the award of the procurement contract for the third Arleigh Burke-class destroyer despite having the funds to advance with the programme in FY2025.
-
US Navy may look to foreign suppliers to accelerate shipbuilding programmes
The US Navy (USN) is currently reassessing its acquisition efforts and seeking ways to reduce the multiple delays across the shipbuilding initiatives.
-
Italy orders two ships as work begins on others along with deliveries and updates
The Italian Navy is being refreshed with two new ships ordered, while in the past six months steel was cut for a new frigate, an enhanced frigate was delivered and Horizon-class frigates passed a design review.