Keel laid for US Navy’s LCS 28
The keel has been laid for the US Navy’s 11th Independence-variant Littoral Combat Ship (LCS) at Austal USA’s shipyard Mobile, on 20 September.
The vessel will be named USS Savannah (LCS 28) on its completion.
This is one of five Independence class LCS vessels currently undergoing construction at Austal USA, with five additional ships in pre-production planning.
The LCS is designed as a fast, agile, focused-mission platform able to operate in near-shore environments and undertake open-ocean operations. The vessels are capable of supporting forward presence, maritime security, sea control and deterrence missions.
Related Equipment in Defence Insight
More from Naval Warfare
-
Euronaval 2026: Red Cat’s Blue Ops follows USV demand from Asia to the Andes
With its B-26 USV in full-rate production, Blue Ops is seeking to turn overseas interest into orders through a combination of lower operating costs, UAV integration and local manufacturing.
-
Euronaval 2026: ‘I want to sell 31 Type 31s by 2031’ - CGO maps Babcock’s global push
Chief growth officer Sir Nick Hine tells Shephard how Babcock is lining up New Zealand, Chile, Denmark and the US for its Arrowhead 140 frigate, speaks on the hybrid navy offer and talks AUKUS.
-
Euronaval 2026: Baltic breakthrough powers Saildrone’s next European expansion
Denmark’s doubled deployment, Mediterranean smuggling routes and Norwegian composite hulls show where uncrewed surveillance demand is heading, while British funding remains unclear.
-
Euronaval 2026: by the power of six, Fincantieri’s MMMV reflects modular naval shift
The 50m, six-person ship from the Italian shipbuilder carries swappable, containerised payloads instead of a fixed mission, reflecting a shift that is becoming increasingly evident.
-
Canada’s submarine availability under pressure as Chicoutimi is unlikely to return to front-line duties
HMCS Victoria and HMCS Windsor could return from their current deep maintenance, but unconfirmed operational timelines leave questions over patrol capacity before the first CPSP arrives.