Fincanteiri Marine Group awaits US Navy talks following icebreaker decision
Following the decision to award VT Halter Marine, a US-based shipbuilder owned by Singapore Technologies (ST) Engineering, the deal to design and build a new fleet of heavy polar icebreakers for the US Coast Guard, one of the losing competitors is awaiting a debrief from the US Navy on the decision.
The US Coast Guard and US Navy, which jointly manage the Polar Security Cutter (PSC) programme, awarded a $746 million contract on 23 April to VT Halter for the lead ship. The contract contains options to build the second and third PSCs, which would push the total value to
Already have an account? Log in
Want to keep reading this article?
More from Naval Warfare
-
Euroatlas brings Greyshark AUV to Asia for its maiden visit
Euroatlas displayed its Greyshark autonomous underwater vehicle outside Europe for the first time, highlighting variant specifications and development progress at IMDEX 2025.
-
Metal Shark starts production on HSMUSVs as US shipyard targets further Caribbean orders
The US shipyard’s new High Speed Maneuverable Unmanned Surface Vessel (HSMUSV) will have a range of more than 500 nautical miles.
-
ST Engineering to supply the Republic of Singapore Navy with counter-mine systems
Singapore Technologies Engineering (ST Engineering) will supply uncrewed naval systems and supporting command and control equipment to support counter-mine operations with deliveries expected to begin in 2027.
-
SOF Week 2025: SubSea Craft introduces MARS USV
The MARS platform was built be a low-signature, multi-role, mission-configurable capability.
-
US and European special operators test Icelandic AI-based solution for marine platforms
Hefring Marine IMAS was designed to optimise vessels’ operation.