BAE to deliver payload tubes for Virginia subs
BAE Systems has received a contract from General Dynamics Electric Boat to produce payload tubes for two of the US Navy’s new Virginia-class submarines, the company announced on 5 June.
Under the contract, BAE Systems will deliver two sets, each consisting of four tubes, for the Virginia payload modules (VPMs) on the SSN 804 and SSN 805. The company will also develop the processes and tooling necessary for the Block V payload tube production. Deliveries are scheduled to begin in 2020.
The VPM extends the length of the Block V submarines over previous versions of the Virginia class by adding an additional mid-body section to create more payload space for increased firepower.
Each large-diameter payload tube can store and launch up to seven Tomahawk cruise missiles. The VPM also offers better flexibility for the integration of future payload types, such as unmanned systems or next-generation weapons.
BAE Systems is also supplying payload tubes for the SSN 803 under a previously awarded VPM contract.
More from Naval Warfare
-
US Navy seeks suppliers to upgrade the MK 41 VLS
The US Navy has been preparing to award a contract for the refurbishment of MK 41 VLS on board USN vessels and other military type ships.
-
Philippine Navy looks to old and new vessels to beef up its fleet
The Philippines has turned to regional neighbours Japan and South Korea in a effort to boost its naval fleet with new and ex-Japanese ships. The bonds between the countries is an acknowledgment of the rising power of China and the continued manoeuvres of the Asian giant throughout the region.
-
US Navy prepares the next phase of the Arleigh Burke-class modernisation
The NAVSEA is carrying out market research and will conduct industry days in August to identify potential providers for the DDG MOD 2.0 stage.
-
Pentagon requests industry support to address issues with low-cost undersea effectors
The US Pentagon Defence Innovation Unit (DIU) will award OTAs for small and medium affordable uncrewed underwater vehicles. Companies can submit their solution until 24 July.