Boeing hopes for third time lucky in Canada with CMMA bid
Undeterred by unsuccessful recent attempts to win business on Canadian military aviation programmes in recent years with its F/A-18E/F Super Hornet and KC-46A Pegasus platforms, Boeing is offering the P-8A Poseidon to meet the requirements of the Canadian Multi-Mission Aircraft (CMMA) programme.
Boeing pledged on 10 February to include a ‘robust industry plan for long-term economic growth in Canada’ as part of its CMMA bid.
CMMA will see the Royal Canadian Air Force retire its 15-strong CP-140 Aurora (P-3 Orion) fleet with a new platform that offers enhanced anti-submarine warfare and ISR capabilities.
Shephard Defence Insight predicts the CP-140s will be withdrawn from service by 2028, and it estimates that it will cost $1.2 billion to replace these aircraft with final deliveries in 2037-2038.
Related Programmes in Defence Insight
Multi-Mission Aircraft (Canada - Option)
Related Equipment in Defence Insight
More from Air Warfare
-
Lockheed Martin takes financial hit amid ongoing F35 troubles
The company remains in negotiations with the US Government over the Lot 18 and 19 F-35 production contract, following the fourth quarter 2023 US$7.8 billion contract modification.
-
Poland set for $7.3 billion F-16 upgrade
Poland’s Foreign Military Sales (FMS) request is for a range of radar, electronic warfare (EW) and missile and bomb test systems to upgrade its fleet of 48 F-16s.
-
Why is there an “insatiable demand” worldwide for AMRAAM?
Recent contracts and requests to purchase this capability have been reaching multi-billion levels.
-
Insight: How India’s Tri-Service MQ-9B $4 billion deal was awarded
After lengthy negotiations, the Indian Ministry of Defence has now signed a US$4 billion contract with the US Government to procure 31 MQ-9B drones from General Atomics, marking India as the largest customer of this UAV model.
-
WaveAerospace aims to launch production of new UAS platforms in 2025
WaveAerospace has been showcasing its MULE heavy-lift VTOL UAS, designed for contested logistics missions with a payload capacity of more than 40kg and up to four hours of endurance, while also introducing Huntress, a fast multirotor UAS. Both will be expected to enter production by 2025.
-
Teledyne FLIR Defense Wins $91 million deal for Black Hornet 4 UAS
The Black Hornet 4 was unveiled 12 months ago and has an improved thermal sensor and an EO camera over the previous platform, and a forward-facing ultrasound sensor and navigation cameras on the top and sides.