USCG receives 11th C-130J Super Hercules
The US Coast Guard (USCG) has received its 11th C-130J Super Hercules long range surveillance aircraft from Lockheed Martin, the USCG announced on 29 November.
The aircraft was delivered in its baseline configuration. It will now move to the L3 Technologies Integrated Systems Platform Integration division to undergo installation of the Minotaur mission system suite.
The aircraft will receive USCG-specific integrated radar, sensor and communications systems, after which it will be redesignated as an HC-130J.
Out of total ten aircraft delivered, seven HC-130Js are operating out of Air Station Elizabeth City, North Carolina, three with Minotaur and four with the legacy mission system. Three aircraft have entered the Minotaur mission system suite modification programme, with the next missionised aircraft delivery scheduled for 2018.
Production of C-130Js 12-14 is currently ongoing, with delivery of two aircraft expected in 2019 and one in 2020.
Related Equipment in Defence Insight
More from Naval Warfare
-
Australia’s A$12 billion Perth shipyard upgrade offers positive sign for AUKUS
While the Australian government insists the investment is predominantly aimed at strengthening the country’s defence capabilities, the upgrade also bodes well for the AUKUS pact which Australia’s defence minister said “is going well”.
-
DSEI 2025: Red Cat expands into USV production with focus on combat-proven technology
At DSEI 2025, Red Cat outlines its expansion from UAVs into uncrewed surface vessels (USVs), positioning itself as a multi-domain defence provider spanning land, sea, and air.
-
Anduril Australia wins A$1.7 billion Ghost Shark XL-AUV contract
The vessels are expected to deliver a major boost to Australia’s undersea warfare capabilities, with production set to start immediately.
-
Royal Canadian Navy will start operating class 2 UAVs in 2028
Acquired under Canada’s Department of National Defence ISTAR UAS project, the drones will be deployed from the Halifax-class frigates.
-
US Navy prepares next step of the F-35 Block 4 upgrade while GAO predicts acquisition delays
The US Navy published a pre-solicitation notice of intent for the third phase of the F-35 Reprogramming Verification & Validation System. Meanwhile, with a five-year delay in its schedule, GAO foresees more postponements in the completion of the Block 4 effort.