Germany’s MKS 180 programme on track says MoD
The decision on the preferred design for Germany’s MKS 180 next generation surface combatant is still on track according to the country’s MoD, despite concerns that it has been deferred.
Earlier reports by the German Press Agency DPA stated the design decision could be delayed into 2020. The first-in-class is expected to enter service with the German Navy by the middle of the next decade.
An MoD spokesperson told Shephard that greater importance is placed on the contract being properly negotiated and examined under the principle of ‘front loading.’
‘We are absolutely convinced that our so called “front loading” in
Our news & analysis is now part of Defence Insight®
A Basic-level or higher Defence Insight subscription is now required to view this content.
More from Naval Warfare
-
As uncrewed naval systems advance, capabilities to counter them are emerging
Research programmes and system procurement efforts to counter uncrewed surface and underwater vehicle threats are accelerating as naval drone uptake spreads.
-
Japan’s first warship sale opens door to future exports but comes with strings attached
Australia’s selection of an upgraded Mogami-class frigate marks Japan’s first-ever export of a major surface combatant. With an ambitious 2029 delivery target, the deal could open the door to further naval exports – but inexperience and geopolitical friction with China loom large.
-
Thinning Arctic ice reveals naval capability gaps and new opportunities
As sea ice extent hits a record low and geopolitical tensions increase in the High North, navies are contending to adopt the technologies needed to operate beneath an increasingly unpredictable Arctic Ocean.