First RAF P-8A flies
The first P-8A Poseidon being built for the Royal Air Force (RAF) has completed its first flight.
The aircraft will now transfer out of Boeing Commercial Airplanes to Boeing Defense, Space and Security to be fitted out with the Poseidon-specific military systems.
The RAF is procuring nine Poseidon aircraft for maritime patrol operations. The first aircraft is due to be handed over to the RAF in October 2019 and will be based at RAF Lossiemouth from Autumn 2020.
Air Commodore Richard Barrow, senior responsible owner for the Poseidon Programme, said: ‘The first cadre of RAF engineers and aircrew have been trained on the P-8A Poseidon which marks the resurgence of the RAF’s long-range maritime patrol capability.
'The Poseidon MRA Mk 1 will enhance the UK’s maritime patrol capability with advanced, state-of-the-art, anti-submarine warfare and anti-surface warfare sensors. This is an exciting time for the RAF especially for those based at RAF Lossiemouth.’
Related Equipment in Defence Insight
More from Naval Warfare
-
Australia is ramping up its uncrewed surface fleet as Sea Archer lines up for key requirement
As advances in uncrewed technology increasingly shape Australia’s maritime future, Shephard spoke with the country’s head of navy capability and a Leidos Australia executive about the operational advantages behind the shift.
-
What does Saab’s operations shake-up mean for its new ‘Naval’ chapter?
Saab’s merger of its Kockums and Naval Combat Systems divisions into a single business area called Naval, effective 1 April 2026, aims to enhance efficiency, innovation and competitive positioning in the naval sector.
-
Iran and the future of amphibious operations: crewed and uncrewed solutions
Amphibious operations are a very unique type of military operation, and global defence industries are developing new solutions to enhance capabilities and efficiency.
-
US Navy to acquire and test uncrewed surface vessel prototypes by the end of FY2026
The new autonomous surface vessels are planned to be operationally fielded in FY2027, following the completion of on-water trials.