Philippines awaits new cutter and frigates
Documents were signed at Coast Guard Base Alameda, California on 21 July to hand over a decommissioned Hamilton-class cutter to the Philippine Navy (PN).
Boutwell is the third high-endurance cutter to be signed over to the PN under the US excess defense articles (EDA) programme. Under its new flag the ship will be known as BRP Andres Bonifacio.
RAdm Joseph Vojvodich, the US Coast Guard’s (USCG) chief acquisition officer, said at the ceremony: ‘The Coast Guard is saddened that this cutter is no longer with our fleet, but we are also proud to send it on a new
Our news & analysis is now part of Defence Insight®
A Basic-level or higher Defence Insight subscription is now required to view this content.
More from Naval Warfare
-
US turns to allies to tackle navy shipbuilding backlog
A White House memorandum acknowledges US Navy shipbuilding backlogs and a weakened industrial base, opening a formal path for South Korean and Japanese yards to help rebuild capacity.
-
US Navy’s $275 billion BBGN plan hinges on shipyard transformation
The US Navy’s planned nuclear-powered warship carries a US$275 billion price tag, but the greater story lies in the industrial overhaul needed to build it, from AI-enabled design to digital twins and modular construction.
-
Asia-Pacific emerges as the largest export market for US-made USVs
Asian customers have placed one of the largest known international purchases of US-built uncrewed surface vessels, highlighting accelerating regional demand for autonomous maritime capabilities and distributed naval operations.