Boeing awarded P-8 damage tolerance work
Boeing will carry out damage tolerance analysis on the P-8A aircraft under a contract modification announced by the US Department of Defense on 5 August.
Under the contract, issued by the US Naval Air Systems Command, Boeing will perform damage tolerance analysis on the P-8A aircraft to determine the damage tolerance rating, and provide non-destructive inspections for structural components on the P-8A aircraft.
The P-8A Poseidon is designed to support maritime surveillance, anti-submarine warfare and anti-ship warfare operations. Boeing is supplying the aircraft to the multiple nations, including the US Navy, UK Royal Air Force, Royal Australian Air Force, Indian Navy and the Norwegian armed forces.
The analysis work will run through to March 2023.
Related Equipment in Defence Insight
More from Naval Warfare
-
Lessons shaping the next phase of Arleigh Burke production post-Flight IIA
The accelerated delivery of the final Flight IIA destroyer, USS Patrick Gallagher, showcases the payoff of years of workforce investment and process reform at Bath Iron Works, with the lessons feeding into Flight III production.
-
Ukraine war drives ‘minimum deployable capability’ doctrine in uncrewed systems development
Ukraine’s battlefield has rewritten the rules of uncrewed systems development. For Syos Aerospace, real-time operator feedback, lean serial production and a system-of-systems philosophy are central to its operating model.
-
Sealift shortfalls set to drive opportunities across NATO navies
A new Council on Geostrategy primer warns that NATO cannot defend its own supply lines. As the alliance faces a sealift and logistics escort deficit, a wave of unawarded procurement is beginning to take shape.
-
AUKUS advance on UUVs contrasts with Virginia-class compromise
The AUKUS partnership is accelerating uncrewed undersea capability while its submarine arm inches forward, and Australia’s decision to settle for three in-service Virginia-class boats raises questions about industrial risk, dependency and whether Pillar II may deliver meaningful capability long before Pillar I can.