From Poland to the Pacific: can Miecznik become a blueprint for other navies?
The first Miecznik-class frigate, ORP Wicher, conducts trials at sea following its launch. (Photo: PGZ)
Poland’s Miecznik frigate programme involves three ships, but the model behind it may matter more than the hulls. By pairing a foreign design with domestic construction and formal technology transfer, Poland chose a route between the two options that have traditionally defined naval procurement: building at home or buying from abroad.
Babcock, which supplied the Arrowhead 140 design the frigates are based on, told Shephard that the shift was not confined to Poland. A company spokesperson said customers across multiple markets were “increasingly seeking more than just the acquisition of a capable warship platform”, and wanted programmes that supported sovereign
Our news & analysis is now part of Defence Insight®
A Basic-level or higher Defence Insight subscription is now required to view this content.
More from Naval Warfare
-
Euronaval 2026: Baltic breakthrough powers Saildrone’s next European expansion
Denmark’s doubled deployment, Mediterranean smuggling routes and Norwegian composite hulls show where uncrewed surveillance demand is heading, while British funding remains unclear.
-
From Chokepoints to the Deep: ASELSAN’s Naval Vision at EURONAVAL
From deployable ship defence to autonomous sea and underwater vehicles, ASELSAN is preparing for a new era of naval security.
-
Canada’s submarine availability under pressure as Chicoutimi is unlikely to return to front-line duties
HMCS Victoria and HMCS Windsor could return from their current deep maintenance, but unconfirmed operational timelines leave questions over patrol capacity before the first CPSP arrives.