Fourth Avante 2200 corvette takes to the water
Spanish shipbuilder Navantia on 24 July launched Jazan as the fourth Avante 2200 corvette out of five on order for the Royal Saudi Naval Forces.
Work on Jazan will continue at the San Fernando shipyard until the vessel is scheduled for delivery to Saudi Arabia in 2023.
The Avante 2200 programme began in late 2018 and Navantia launched the first vessel (Al-Jubail) in July 2020. The second and third (Al-Dariyah and Hail) were launched in August 2020 and March 2021 respectively.
Shephard Defence Insight forecasts delivery of the final vessel in 2024 and calculates the unit cost of each corvette at $420 million.
The Avante 2200 design is 104m long with a beam of 14m and a complement of up to 102 passengers and crew.
Navantia integrates multiple systems including its Catiz combat management system, Hermesys integrated communications system, Dorna fire-control system and Minerva integrated bridge system.
MTU provides the engines and RENK supplies gearboxes.
As well as construction of the five vessels, Navantia is responsible for lifecycle support (for five years after delivery of Al-Jubail) and crew training at a special centre in Spain.
It also provides equipment to maintain the corvettes Jeddah Naval Base.
The Avante 2200 programme is being executed in concert with the state-owned Saudi Arabian Military Industries (SAMI), which is benefiting from technology transfer to develop indigenous industrial capabilities. SAMI is tasked with implementing a Saudi government target of localising 50% of annual military spending by the end of the decade, in line with the Vision 2030 economic modernisation programme.
More from Naval Warfare
-
BMT and DNV partner to meet Australia’s heavy landing craft requirement
Under Project Land 8710 Phase 2, Australia has been seeking to acquire an undisclosed number of Littoral Manoeuvre Vessels to replace the Balikpapan-class. The programme has an estimated value of AU$1.4 billion (US$910 million), with IOC slated for 2032.
-
Babcock to take over upkeep of Royal Navy Type-23 frigates
The Royal Navy’s Type-23 Duke-class frigates for the UK Royal Navy were designed as anti-submarine warfare (ASW) ships but now have a multi-role function. Of the 16 Type 23s built, 12 remain in service with the Royal Navy and will be replaced by the Type-26 frigates before 2035.
-
Austal completes autonomy trials with former Royal Australian Navy patrol boat
The work took place under the Patrol Boat Autonomy Trial (PBAT), which has been a collaboration between Austal, Greenroom Robotics, the Trusted Autonomous Systems Defence Cooperative Research Centre and the Royal Australian Navy’s (RAN) Warfare Innovation Navy Branch.
-
Singapore launches fourth and final Type 218SG submarine
The era of southeast Asian submarine modernisation has been in full swing fuelled by growing tensions in the South China Sea.
-
Keel laid for third Hellenic Navy frigate as harbour trials start for first
On 24 March 2022, Greece and Naval Group have signed a contract for three defence and intervention (FDI) frigates. Two warships will be due for delivery in 2025 and the third expected the following year, with the deal including an option to add a fourth frigate to be ready in 2027.