Wärtsilä to upgrade CCG vessels
Wärtsilä will upgrade the propulsion generators of the Canadian Coast Guard’s (CCG) 1100 class High Endurance Multi-task Vessels to improve reliability, the company announced on 9 November.
The vessels are used for buoy tending, search and rescue operations and icebreaking in each of the three regions covered by the CCG.
Wärtsilä and Public Services and Procurement Canada signed an agreement for replacing the diesel engines and integration work in July 2017. The contract covers one vessel but allows for the five additional 1100 class vessels and for a training engine.
The Wärtsilä engines are designed to be capable of doing a load step of 43%, as required by an icebreaker, and to operate in cold air conditions at full load where the air temperature can fall as low as -30° Celsius and rise as high as +45° Celsius.
More from Naval Warfare
-
BMT and DNV partner to meet Australia’s heavy landing craft requirement
Under Project Land 8710 Phase 2, Australia has been seeking to acquire an undisclosed number of Littoral Manoeuvre Vessels to replace the Balikpapan-class. The programme has an estimated value of AU$1.4 billion (US$910 million), with IOC slated for 2032.
-
Austal completes autonomy trials with former Royal Australian Navy patrol boat
The work took place under the Patrol Boat Autonomy Trial (PBAT), which has been a collaboration between Austal, Greenroom Robotics, the Trusted Autonomous Systems Defence Cooperative Research Centre and the Royal Australian Navy’s (RAN) Warfare Innovation Navy Branch.
-
Singapore launches fourth and final Type 218SG submarine
The era of southeast Asian submarine modernisation has been in full swing fuelled by growing tensions in the South China Sea.
-
Keel laid for third Hellenic Navy frigate as harbour trials start for first
On 24 March 2022, Greece and Naval Group have signed a contract for three defence and intervention (FDI) frigates. Two warships will be due for delivery in 2025 and the third expected the following year, with the deal including an option to add a fourth frigate to be ready in 2027.