HII to overhaul USS John C Stennis
Huntington Ingalls Industries has received an advance planning contract for the refuelling and complex overhaul (RCOH) of the US Navy's nuclear-powered aircraft carrier USS John C Stennis.
The contract, which has a base value of $187.5 million and is initially funded for one year, includes engineering, design, material procurement and fabrication, documentation, resource forecasting and pre-overhaul inspections.
Future modifications could extend the period of performance to 30 months and increase the contract value if additional options are exercised.
USS John C Stennis was delivered to the navy in 1995. It will be the seventh Nimitz-class carrier to undergo an RCOH, representing 35% of all maintenance and modernisation completed during its 50-year service life.
Planning is set to begin in August 2018 and the RCOH is scheduled to begin in January 2021.
More from Naval Warfare
-
SEA to trial sonar software for UK Royal Navy
The UK Royal Navy’s anti-submarine warfare Spearhead programme, run by the service’s Develop Directorate, has been investigating future and existing technologies with a particular focus on the USV arena.
-
Australia’s new frigate options: No easy choices as pressure mounts on DoD
A new class of General Purpose ‘Tier 2’ frigate will replace the Royal Australian Navy’s (RAN’s) Anzac-class frigates, but the selected design options appear to have major issues in terms of compatibility and availability for the future fleet.
-
Royal Navy’s new Dreadnought SSBNs to be equipped with OSI’s ECPINS
The contracts between OSI Maritime Systems (OSI) and BAE Systems Submarines will encompass continued support for the Astute-class nuclear-powered submarines (SSN) and the future Dreadnought-class nuclear-powered ballistic missile submarines (SSBN).