GSL lays keel for third CGOPV
Goa Shipyard (GSL) has begun construction of the third Coast Guard Offshore Patrol Vessel (CGOPV) for the Indian Coast Guard, with the keel laid on 1 August 2018.
GSL signed a contract with the Indian Ministry of Defence in August 2016 to build five CGOPVs for the coast guard. Vessels under the 05 CG OPV project are scheduled to be delivered January 2020 through to June 2021.
The vessels will be fitted with modern and technologically advanced machinery and computerised controls systems. The 2400t vessels will be equipped with quick response boats for rescue and anti-piracy missions.
More from Naval Warfare
-
SEA to trial sonar software for UK Royal Navy
The UK Royal Navy’s anti-submarine warfare Spearhead programme, run by the service’s Develop Directorate, has been investigating future and existing technologies with a particular focus on the USV arena.
-
Australia’s new frigate options: No easy choices as pressure mounts on DoD
A new class of General Purpose ‘Tier 2’ frigate will replace the Royal Australian Navy’s (RAN’s) Anzac-class frigates, but the selected design options appear to have major issues in terms of compatibility and availability for the future fleet.
-
Royal Navy welcomes mine-hunting mothership
RFA Stirling Castle, a 6,000-tonne vessel, will start operations later this year.
-
Royal Navy to receive DragonFire laser system
The UK Ministry of Defense (MoD) made the decision to accelerate the laser programme from the demonstrational stage to an operational laser weapon.
-
Royal Navy’s new Dreadnought SSBNs to be equipped with OSI’s ECPINS
The contracts between OSI Maritime Systems (OSI) and BAE Systems Submarines will encompass continued support for the Astute-class nuclear-powered submarines (SSN) and the future Dreadnought-class nuclear-powered ballistic missile submarines (SSBN).