Boeing postpones 787 first flight
Boeing has announced that first flight of the 787 Dreamliner will be postponed due to a need to reinforce an area within the side-of-body section of the aircraft.
The need was identified during the recent regularly scheduled tests on the full-scale static test aeroplane. Preliminary analysis indicated that flight testing could proceed this month as planned. However, after further testing and consideration of possible modified flight test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur.
First flight and first delivery will be rescheduled following the final determination of the required modification and testing plan. It will be several weeks before the new schedule is available.
The 787 team will continue with other aspects of testing on the first aircraft, including final gauntlet testing and low-speed taxiing. Work will also continue on the other five flight test aircraft and the subsequent aircraft in the production system.
Scott Carson, president and CEO of Boeing Commercial Airplanes, said a team of experts has already identified several potential solutions.
"Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localised area requiring reinforcement. Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team," Carson explained.